Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Aljassmi, H, Han, S and Davis, S (2014) Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. Journal of Construction Engineering and Management, 140(01).

Casanovas, M d M, Armengou, J and Ramos, G (2014) Occupational Risk Index for Assessment of Risk in Construction Work by Activity. Journal of Construction Engineering and Management, 140(01).

Chang, C (2014) Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique. Journal of Construction Engineering and Management, 140(01).

Choi, S, Kim, D Y, Han, S H and Kwak, Y H (2014) Conceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning. Journal of Construction Engineering and Management, 140(01).

González, P, González, V, Molenaar, K and Orozco, F (2014) Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(01).

Laryea, S and Lubbock, A (2014) Tender Pricing Environment of Subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(01).

Ling, F Y Y, Ke, Y, Kumaraswamy, M M and Wang, S (2014) Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 140(01).

Narbaev, T and De Marco, A (2014) Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion. Journal of Construction Engineering and Management, 140(01).

Ning, Y and Ling, F Y Y (2014) Boosting Public Construction Project Outcomes through Relational Transactions. Journal of Construction Engineering and Management, 140(01).

Panas, A and Pantouvakis, J P (2014) Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations. Journal of Construction Engineering and Management, 140(01).

Rosenfeld, Y (2014) Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction Engineering and Management, 140(01).

Sun, C, Mackley, A and Edara, P (2014) Programmatic Examination of Missouri Incentive/Disincentive Contracts for Mitigating Work Zone Traffic Impacts. Journal of Construction Engineering and Management, 140(01).

  • Type: Journal Article
  • Keywords: Workspace; Construction management; Contractors; Traffic management; Highways and roads; Time factors; Incentive/disincentive; Innovative contracting; Work zone impacts; Road user cost; Contracting;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000796
  • Abstract:
    Incentive/disincentive clauses (I/D) are designed to award payments to contractors if they complete work ahead of schedule and to deduct payments if they exceed the completion time. A previously unanswered question is, “Did the costs of the actual work zone impacts that were avoided justify the incentives paid?” This paper answers that question affirmatively based on an evaluation of 20 I/D projects in Missouri from 2008 to 2011. Road user costs (RUC) were used to quantify work zone impacts and included travel delays, vehicle operating costs, and crash costs. Conditions during construction were compared to after construction. Delay costs and crash costs were computed using published data. For every dollar paid in incentives, approximately 5.3 dollars of RUC savings resulted from the use of I/D. Also, I/D projects had a higher on-time completion percentage and a higher number of bids per call than average projects. However, I/D projects resulted in 4.52% higher deviation from programmed costs and possibly more changes made after the award.

Syal, M, Duah, D, Samuel, S, Mazor, M, Mo, Y and Cyr, T (2014) Information Framework for Intelligent Decision Support System for Home Energy Retrofits. Journal of Construction Engineering and Management, 140(01).

Yang, I, Lin, Y and Lee, H (2014) Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. Journal of Construction Engineering and Management, 140(01).

Zhang, S, Du, C, Sa, W, Wang, C and Wang, G (2014) Bayesian-Based Hybrid Simulation Approach to Project Completion Forecasting for Underground Construction. Journal of Construction Engineering and Management, 140(01).